
The captain of the ship has a major job to steer and control this giant piece of floating steel. They have to have several years of training and experience behind them to take on this role. Even when the ship arrives at port, the teams there have a massive challenge of loading and unloading as well.
As soon as each container arrives it’s delivery details are loaded into the system. This enables the whole team involved with loading these units, to access the required information. The team will load the containers quickly and efficiently – moving over 10,000 containers per day should have given them enough practice by now!
When containers are loaded onto the ships they are sorted by destination, by ship and by weight. The machinery that is used to load and unload the containers is called a gantry crane. This equipment is around 89m high and weighs 17 tonnes – youd certainly need a head for heights to do this job!! When the containers are in the air and hovering over the vessel, the drop is usually about 80m down to the deck.
So there you go, a few little facts for today to get you thinking. The next time youre chowing down on a banana or plum, remember the journey they probably had to get here!
Blog Post Written By Lucy Stain at Lion Containers Ltd
HEAD OFFICE
Gallan Park, Cannock, Staffordshire, WS11 0XG
Email: info@lioncontainers.co.uk
0333 600 6260
Careers with us
Trade working with us
UK Company Reg: 07944912 | VAT No: 133060068
Careers with us
Trade working with us
UK Company Reg: 07944912 | VAT No: 133060068
© Copyright 2026 Lion Containers Ltd. All Rights Reserved. | Terms & Conditions | Privacy Policy | Cookie Policy
© Copyright 2026 Lion Containers Ltd. All Rights Reserved.
Terms & Conditions | Privacy Policy | Cookie Policy